![Uzbekistan Talimarjon Power Plant Production Efficiency Improvement Project](https://birlesim.com/files/projeler/zbekistan_talimarjon_enerji_santrali_retim_verimlilii_gelitirme_projesi/alk_zbekistan_3.jpg)
Uzbekistan Talimarjon Power Plant Production Efficiency Improvement Project
EMPLOYER: ÇALIK ENERJİ SAN. VE TİC. AŞ DATE: 2024 LOCATION: UZBEKISTAN AREA: 12.200 m2 SCOPE: MECHANICAL INSTALLATION WORKS
EMPLOYER: ÇALIK ENERJİ SAN. VE TİC. AŞ DATE: 2024 LOCATION: UZBEKISTAN AREA: 12.200 m2 SCOPE: MECHANICAL INSTALLATION WORKS